Update on Gloucester Sign At The Rotary

Update on Gloucester Sign

IMG_6321

The face ought to be near done today. The rope trim and the welcome to and Americas oldest seaport should be done today.

All that will be left is to paint the support beams in the back of the sign.

This will take the sign all through the summer and this fall a new sign will need to be designed and done.

Thank you
Cheryal’s Signs

IMG_6322

 

Advertisements